The emergency team of RT helps prepare the houses of Lysychansk for the heating season.
The emergency team from Tatarstan continues work to prepare the apartment buildings of Lysychansk for winter. Specialists, together with the city's utility services, are restoring engineering networks, repairing heating systems, and eliminating emergency sections of the water supply. The mobile team includes specialists from JSC "Kazanenergo" — a site manager, a welder, and two repair plumbers. They are equipped with the necessary equipment, transport, and an autonomous generator, allowing them to carry out work even during power outages. The main focus is on preparing the housing stock for the heating season. Workers inspect the basements and attics of the buildings, eliminate identified malfunctions, and prepare engineering systems for hydraulic testing. "Each facility is unique. In some places, we have to work in very cramped conditions, but this does not affect the quality. Our task is to eliminate all identified defects and prepare the building for the heating season," said Pavel Tarasov, the site manager of the repair and construction management of JSC "Kazanenergo."
More news about the event:
The emergency team from Tatarstan is preparing the engineering networks of Lysychansk for winter. The emergency team from Tatarstan continues work in Lysychansk, helping to prepare apartment buildings for the upcoming heating season. 21:43 14.07.2026 IA Tatar-inform - Kazan
The emergency team from Tatarstan helps prepare the houses of Lysychansk for the heating season. The emergency team from Tatarstan continues work to prepare the apartment buildings of Lysychansk for winter. 18:56 14.07.2026 GTRK Tatarstan - Kazan
News from neighboring regions on the topic:
The capital repair program for 2026 will affect almost 200 Sevastopol apartment buildings. The Government of Sevastopol has summarized preliminary results of the regional program for the capital repair of apartment buildings for 2026. 14:55 14.07.2026 NTS TV Channel - Sevastopol
Preparing Samara houses for the cold: what depends on energy workers and management companies, and what depends on the residents themselves? Interview Housing and Utilities Varvara Zhiroukhova Editor. There is less and less time before the start of the new heating season. 13:21 14.07.2026 ProGorodSamara.Ru - Samara
In Vyborg, preparations for the heating season continue. Photo: vk.com/wall-221717943_894. In our city, preparations for the heating season continue. 11:20 14.07.2026 Vbgcity.Ru - Vyborg
"Vesti. Interview": Semyon Tegentsev — on preparations for the new heating season. In the Tyumen region, preparations for the new heating season are actively underway. 18:14 13.07.2026 GTRK Region-Tyumen - Tyumen
In the Astrakhan region, preparations for the 2026–2027 heating season are underway. Preparatory work is ongoing at all 28 heat supply enterprises and distribution networks in the region. A meeting on the preparation for the 2026–2027 heating season was held by Governor Igor Babushkin. 12:24 13.07.2026 Privolzhskaya Gazeta - Nachalovo
Leningrad region is preparing for the heating season. Preparation for the heating season has become one of the main topics of the government commission on regional development. 10:01 13.07.2026 Committee for Housing and Utilities - Leningrad Region
In Primorye, eleven thousand kilometers of pipes are being prepared for winter. Today, Governor Oleg Kozhemyako held a meeting with municipal leaders on preparations for the heating season. Only in Vladivostok, during the planned preparation for the heating season, 16:43 13.07.2026 Vostok.Today - Vladivostok
More than 11 thousand kilometers of utility networks are being prepared for winter in Primorye. Preparations for the heating season in Primorsky Krai have entered an active phase. 14:44 13.07.2026 Administration of Primorsky Krai - Vladivostok
More than 11 thousand kilometers of utility networks are being prepared for winter in Primorye. Preparations for the heating season in Primorsky Krai have entered an active phase. 14:21 13.07.2026 Ministry of Housing and Utilities of Primorsky Krai - Vladivostok
In Ulan-Ude, a new boiler will be installed at the "South-Western" boiler house for winter. The city continues preparations for the 2026–2027 heating season. Photo: Ulan-Ude City Hall. Preparations for the upcoming heating season continue in Ulan-Ude. 12:13 13.07.2026 Infpol.Ru - Ulan-Ude
Ulan-Ude is preparing for winter. Preparations for the heating season were discussed at a meeting chaired by Ulan-Ude Mayor Igor Shutenkov. 12:02 13.07.2026 VostokTeleInform - Ulan-Ude
Другие Новости Казани (Казань716)
The emergency team of RT helps prepare the houses of Lysychansk for the heating season.
The emergency team from Tatarstan continues work on preparing apartment buildings in Lysychansk for winter. 14.07.2026. GTRK Tatarstan. Republic of Tatarstan. Kazan.
