In the Zelenodolsk district, preparations for the heating season of the engineering infrastructure have begun.
38 boiler houses provide heating for 724 residential buildings with central heating. In total, there are 724 apartment buildings with central heating in the Zelenodolsky district. They are supplied with heat by 38 boiler houses. Quality heating supply during the heating season is the result of extensive systematic work that begins immediately after its conclusion and is aimed at ensuring the safety and comfort of residents. All boiler houses will undergo repairs and technical maintenance of boilers, calibration of manometers and gas concentration alarms, inspection of shut-off valves, and more. For the summer period, JSC "Zelenodolsk PTS" has planned major repairs of 3.5 km of networks. Management companies have conducted inspections of the structures of apartment buildings and based on them approved summer work plans. Residents of Zelenodolsk are urged: - If you notice water on the surface of the ground or ground subsidence due to a rupture in the networks, please report it immediately to the emergency dispatch service of ZPTS at the following numbers: 6-04-66, 89600558071.
Photo: "Official Zelenodolsk"
Author
More news about the event:
In the Zelenodolsky district, preparations for the heating season's engineering infrastructure have begun.
38 boiler houses provide heating for 724 residential buildings with central heating. In total, there are 724 apartment buildings with central heating. 10:22 28.05.2026 News of Zelenodolsk - Zelenodolsk
On the preparation of engineering infrastructure for the heating season
Quality heating supply during the heating period is the result of extensive systematic work that begins immediately after its conclusion and is aimed at ensuring the safety and comfort of residents. 09:32 28.05.2026 Zelenodolsky district - Zelenodolsk
News from neighboring regions on the topic:
The Ministry of Defense of Russia summed up the results of the heating season and set tasks for the upcoming period.
On May 21-22, at the logistics support headquarters of the Armed Forces of the Russian Federation, under the leadership of Deputy Minister of Defense Colonel General Alexander Sanchik, the results of the 2025/26 heating period were summarized. 11:32 27.05.2026 Arctic-TV - Murmansk
Preparation for the next heating period will be carried out according to the approved plan.
In accordance with p. 3.3, 7 of the Rules for ensuring readiness for the heating period and the Procedure for conducting readiness assessments, 11:20 27.05.2026 Kuandyk City District - Kuandyk
In Pyatigorsk, a two-week repair of city boiler houses has started.
In Pyatigorsk, a preventive two-week repair of boiler houses has started in preparation for the autumn-winter period. 15:21 26.05.2026 IA Victory 26 - Stavropol
In the Tula region, the preparation for the upcoming heating season was discussed.
Photo: tularegion.ru
On May 25, at a working meeting with the executive authorities of the Tula region, chaired by Governor Dmitry Milyaev, the results of the past heating period and plans for the upcoming one were discussed. 14:58 26.05.2026 IA Novomoskovsk Today - Novomoskovsk
Другие Новости Казани (Казань716)
In the Zelenodolsk district, preparations for the heating season of the engineering infrastructure have begun.
38 boiler houses provide heat to 724 residential buildings with central heating. In total, there are 724 apartment buildings with central heating in the Zelenodolsky district. 28.05.2026. News of Zelenodolsk. Republic of Tatarstan. Zelenodolsk.
